Mon. Nov 23rd, 2020

NewsT4

Fast worldwide News

Sports Lorry’s wide load delays ferry sailing to Skye

1 min read
Image copyright Energee A ferry sailing was delayed for more than two hours after there were difficulties getting a lorry and its wide load off the boat.The lorry was carrying a static caravan and there was little room to manoeuvre as it tried to exit the MV Hebrides at Lochmaddy in North Uist.The CalMac ferry's…
Sports Lorry’s wide load delays ferry sailing to Skye

Sports

sports LorryPortray copyright
Energee

A ferry sailing used to be delayed for better than two hours after there were difficulties getting a lorry and its extensive load off the boat.

The lorry used to be carrying a static caravan and there used to be tiny room to manoeuvre as it tried to exit the MV Hebrides at Lochmaddy in North U.s..

The CalMac ferry’s departure from Lochmaddy used to be delayed by two hours and 34 minutes.

The MV Hebrides used to be as a consequence of advance in Uig in Skye on the later time of 16: 09.

The topic had a knock-on invent on the 14: 00 Uig-Tarbert 16: 00 Tarbert-Uig products and companies.

More Stories

Leave a Reply

Your email address will not be published. Required fields are marked *

You may have missed